+ more
AVONBANK
WIM's flagship project, estimated to contain 488mt @ 4.0% THM (JORC 212, Indicated & Inferred). Positive mineral assemblage of 80% VHM, containing over 20% Zircon. Existing infrastructure within project area - rail, roads, power & water. Located within 300km of several major Ports.
+ more
BUNGALALLY
Shallow lying HMS deposit, estimated to contain 205mt @ 2.7% THM (JORC 2012, Inferred). Mineral assemblage averages 80% VHM, including over 20% Zircon. Existing infrastructure including rail, roads, power & water. Located within 300km of several major Ports.
+ more
WEDDERBURN
Shallow lying HMS deposit, with an Exploration Target of 150-200mt @ 3-4% HM. Existing infrastructure nearby and within 210km of Port of Melbourne & 75km from mining hub Bendigo.